This ground-breaking 8 storey (63 apartment) project was erected in 4 weeks utilising a parallel on and off-site construction program which decreased construction time by more than 6 months compared with a conventional build. Each individual apartment was broken up into one of 7 different modules constructed off-site by Unitised Building. The completed modules were then transported to site and craned into place.
The unitised design allows for several long term benefits, including the ability to design for future disassembly, hence condiderably reducing the embodied energy of the building as elements can be re-used. AAF is very proud to be a part of this special project.
Address: Russell Place, Melbourne
Architect: Fender Katsalidis
Builder: Hickory Developments (Unitised Building constructed the individual apartments)
Fabricator: Cladding Systems
Products: Nu-Wall aluminium cladding Aero 115
Colour: Interpon D1000 Sablé™ Bass GN297A
Completed: June 2010
| Colour | Finish | Warranty | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Name | Code | Manufacturer | Sample | Type | Brand | Powder | Lustre | Film | Colour | Adhesion | |
| Ripple/Texture | Sablé™ Bass | GN297A | Akzo Nobel - Interpon® |
|
P | AAF Powdercoating | D1000 Sablé™ | Matt | 10yrs Residential BCA Class 1 or 10 | 10yrs Residential BCA Class 1 or 10 | None |